    ADDING THE APALLINONE TO THE AUTO SENTRY PETRO IN THE ORIGINAL MODEL Tools Required Prior to performing this procedure you will need to have the following tools: #1 Flat head screw driver Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based...
  • APALLINONEIN EXP - see INSTR0076
    Adding the Auto Passport All-in-one RFID Reader top the Wash Valet eXP Tools Required Prior to performing this procedure you will need to have the following tools: #1 Flat head screw driver Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary bas...
  • eKeypad for Vacuums and Self Serve Bays
    Wiring the eKeypadfor Vacuums and Self-Serve Bays     There are two different power wiring options for the eKeypad:   Option A: 12v/24v DC Option B: PoE (Power over ethernet)   WARNING    DO NOT wire both 12v/24v DC and PoE at the same time           Please contact ICS Technical Support if any...
  • Field instructions to install ENTDISP46UPD01 in an ENTSIGN with existing ENTDISPLAY46CC2
      Tools Required Parts Included Powering Down the Entrance Sign WARNING: Failure to turn off the Sign increases the risk of serious bodily injury or death. On the site server desktop, click on the VNC icon for the Entrance Sign. On the menu bar, click the Windows flag icon. Click the Shutdown ...
  • Field instructions to install ENTDISP46UPD01 in an ENTSIGN with existing ENTDISPLAY46CC3
    REPLACING ENTDISPLAY46CC3 IN AN ENTRANCE SIGN Tools Required Prior to performing this procedure you will need to have the following tools:  #2 Phillips screwdriver  Small flat screwdriver Time to Completion We estimate that it will take 1 hour to perform this procedure, time will vary based on ...
  • ICS-CardRead1 Instructions
        Replacing USB Credit Card Reader for all Auto Sentry Models     Completion TimeEstimated time to complete this procedure is 15 minutes. Keep all hardware organized as you work. Powering Down the Auto Sentry WARNING: Failure to turn off the Auto Sentry increases the risk of serious bodily inj...
  • IDTech TXP to IDTech First Data with NFC and Front-facing barcode in ENC2
    Auto Sentry Conversion from TXP IDTech Card Reader to First Data IDTech Card Reader and Front Facing Barcode Scanner Tools Required Prior to performing this procedure you will need to have the following tools: 5/16”, 11/32” and 3/8” nut drivers or ratchets Drill with 3/16” and ½” drill bits Jig ...
  • Instruction for installing the ENTDISP46UPD02 in a menu sign with motherboard removal
    Installation of the Update to the Digital Menu Sign Video Board Controller Panel       Completion Time Estimated time to complete this procedure is one hour. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power supply before installin...
  • Instructions for adding motherboard to an ENT1-07, turning it into an ENT1-03. MB03 motherboard - 07 to 03 upgrade
    ENTRANCE SIGN CONVERSIONENT1-07 to ENT1-03 byADDING A MOTHERBOARDMB03 Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver Time to Completion We estimate that it will take 15 minutes to perform this procedure, time will vary based on...
  • Instructions for adding motherboard to an ENT1-07, turning it into an ENT1-03. MB170 motherboard
    Digital Menu Sign ENT1-07 converting it to an Exit Sign ENT1-03 by adding a motherboard Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver Time to Completion We estimate that it will take 15 minutes to perform this procedure, time ...
  • Instructions for Adding or Replacing the VIBRATIONSEN in AS7
    Vandalism Deterrent Alarm Installation in the Auto Sentry flex HD         Completion Time We estimate that it will take 15 minutes to perform this procedure. Keep all hardware organizedas you work. Powering Off the Auto Sentry   WARNING: Failure to turn off the Auto Sentry increases the ris...
  • Instructions for AS3 upgrade from Spectrum Air TXP to IDTech VP5300
    Auto Sentry flex upgrade from Spectrum Air TXP to IDTech VP5300           Completion Time Estimated time to complete this procedure is 2 hours. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power supply before installing new compone...
  • Instructions for BARCODERDR to SCN000002-00 conversion in an AS Flex ENC2 enclosure - top
    Replacing Bar Code Reader with Bar Code Scanner in an Auto Sentry Tools Required Prior to performing this procedure, you will need to have the following tools: Phillips Screw driver 3/8” nut driver or ratchet Drill with 5/32” drill bit Jigsaw Vacuum cleaner, towel Small sharp knife Small sander ...
  • Instructions for Bezel 8 Card Reader
    Auto Sentry Conversion to the Bezel Credit Card Reader Tools Required Prior to performing this procedure you will need to have the following tools: Small, sharp knife 3/8” nut driver or ratchet 11/32” nut driver or ratchet Time to Completion We estimate that it will take 2 hours to perform this...
  • Instructions for condensate drip tubing
      AUTO SENTRY CPT CONDENSATE DRAIN HOSE CONFIGURATION Tools Required Prior to performing this procedure you will need to have the following tools:  11/32” nut driver or ratchet   Time to Completion We estimate that it will take 15 minutes to perform this procedure, time will vary based on ski...
  • Instructions for Configuring Gen Mega cassettes for top or bottom
    CONFIGURING A GEN MEGA BILLDISPENSER CASSETTEFOR THE TOP OR BOTTOM LOCATION   Completion Time We estimate that it will take 15 minutes to perform this procedure. Keep all hardware organizedas you work. Instructions This procedure only needs to be completed if you are changing the location of the...
  • Instructions for ENT1 Conversion Heat Exchanger to A/C
    46” Entrance Sign Conversion Heat Exchanger to Air Conditioner Tools Required Prior to performing this procedure, you will need to have the following tools: Phillips Screw driver Small flat screw driver A second person to help with lifting the rear doors 3/8” and 11/32” nut driver or wrench T...
  • Instructions for ENTSIGN conversion from 220V Rittal AC and door to same door with 110V ICEQUBE AC and Dinrail
    Entrance Sign Conversion to a New 120V Ice Qube Air Conditioner Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver Small Flat Screw driver 7/16" nut driver or ratchet Time to Completion We estimate that it will take 1 hour to perfo...
  • Instructions for F400 bill dispenser RAS mode sensor conditions
    F400 BILL DISPENSER –  READING THE SENSOR CONDITONS IN RAS MODE Tools Required Prior to performing this procedure you will need to have the following tools: Dollar bill or small piece of paper Completion Time We estimate that it will take 15 minutes to perform this procedure, time will vary bas...
  • Instructions for F400 bill dispenser sensor cleaning
    Fujitsu F400 Bill Dispenser Sensor Location and Cleaning           Completion Time Estimated time to complete this procedure is 30 minutes. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power supply before installing new components....
  • Instructions for GBA bill acceptor
    Auto Sentry Upgrade to the GBA Bill Acceptor Tools Needed Small Phillips screwdriver 11/32” nut driver or ratchet Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based on skill set. NOTE: Keep all hardware organized as you work. ATTENTION: ...
  • Instructions for Heat Exchanger to AC conversion in an Entrance Sign
    Entrance Sign Conversion Heat Exchanger to Air Conditioner   Tools Required Prior to performing this procedure, you will need to have the following tools: Phillips Screw driver Small flat screw driver A second person to help with lifting the rear doors 5/16” nut driver or ratchet Time to Compl...
  • Instructions for IDTech to TXP conversion in AS4
    Conversion from IDTech to TXP in Auto Sentry Petro and a New Decal Powering Down the Auto Sentry Petro WARNING: Failure to power off the Auto Sentry Petro increases the risk of serious bodily injury or death, and also causes the credit card reader to go into a tamper state which will then have to...
  • Instructions for IDTech upgrade in AS3 SuperFlex
    Auto Sentry Conversion adding IDTech Card Readers to an Auto Sentry Super flex Tools Required Prior to performing this procedure you will need to have the following tools: 3/8” nut driver or ratchet 11/32” nut driver or ratchet 5/16” nut driver or ratchet Small, sharp knife Time to Completion T...
  • Instructions for installation of the APALLDISBOX antenna distribution box
    APALLDISBOX – USING THE RFID READER IN A LANE WITH NO AUTO SENTRY   Tools Required Prior to performing this procedure you will need to have the following tools: Flat head screw driver Time to Completion We estimate that it will take 15 minutes to perform this procedure, time will vary based on ...
  • Instructions for installation of the APALLDISBOX antenna distribution box
    MDS SENSOR POT LEVEL ADJUSTMENT ON A FUJITSU F400 BILL DISPENSER Tools Required Prior to performing this procedure, you will need to have the following tools: #2 Phillips screw driver Flat head screw driver Time to Completion We estimate that it will take 10 minutes to perform this procedure, t...
  • Instructions for Installing a coin acceptor in an ExP
    Auto Sentry eXP Install the Coin Acceptor Tools Required Prior to performing this procedure, have the following tools available: Phillips Screw driver 3/8” nut driver or ratchet 11/32” nut driver or ratchet Sharp hobby knife Time to Completion We estimate that it will take 1 hour to perform thi...
  • Instructions for Installing a coin hopper in an ExP
    Auto Sentry ExP Install the Coin Hopper Tools Required Prior to performing this procedure you will need to have the following tools: #2 Phillips Screw driver 3/8”, 11/32”, 5/16”, and ¼” nut drivers or ratchet Time to Completion ICS estimates that it will take 2 hours to perform this procedure, ...
  • Instructions for installing a loop detector in AS4 Petro
    Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver 5/16” nut driver or ratchet Small flat screw driver Wire cutter Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based on skill...
  • Instructions for installing an APALLINONE in a new AS Flex - also see procedure IG Auto Passport Flex All-in-one 3.0
    Installing the RFID Auto Passport, RFID All-In-One Reader Antenna to an Auto Sentry flex       Completion Time We estimate that it will take 30 minutes to perform this procedure. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power su...