Search

  • Instructions for DeLaRue 3-pin power to Genmega 10-pin power conversion in Flex
    Genmega Bill Dispenser Power Cable Conversion 3-pin to 10-pin Power Cable   Tools RequiredYou will need to have the following tools:   Parts Included   Completion TimeWe estimate that it will take 15 minutes to perform this procedure. Keep all hardware organizedas you work. Instructions to Powe...
  • Instructions for ENT1 Conversion Heat Exchanger to A/C
    46” Entrance Sign Conversion Heat Exchanger to Air Conditioner Tools Required Prior to performing this procedure, you will need to have the following tools: Phillips Screw driver Small flat screw driver A second person to help with lifting the rear doors 3/8” and 11/32” nut driver or wrench T...
  • Instructions for ENTSIGN conversion from 220V Rittal AC and door to same door with 110V ICEQUBE AC and Dinrail
    Entrance Sign Conversion to a New 120V Ice Qube Air Conditioner Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver Small Flat Screw driver 7/16" nut driver or ratchet Time to Completion We estimate that it will take 1 hour to perfo...
  • Instructions for F400 bill dispenser RAS mode sensor conditions
    F400 BILL DISPENSER –  READING THE SENSOR CONDITONS IN RAS MODE Tools Required Prior to performing this procedure you will need to have the following tools: Dollar bill or small piece of paper Completion Time We estimate that it will take 15 minutes to perform this procedure, time will vary bas...
  • Instructions for F400 bill dispenser sensor cleaning
    Fujitsu F400 Bill Dispenser Sensor Location and Cleaning           Completion Time Estimated time to complete this procedure is 30 minutes. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power supply before installing new components....
  • Instructions for Fujitsu F100 single to F400 dual conversion in the Auto Sentry flex
    Tools Required Prior to performing this procedure, you will need to have the following tools: Screw Driver 11/32” nut driver or socket 7/16” nut driver or socket Completion Time We estimate that it will take 15 minutes to perform this procedure. Keep all hardware organized as you work. WARNING:...
  • Instructions for GBA bill acceptor
    Auto Sentry Upgrade to the GBA Bill Acceptor Tools Needed Small Phillips screwdriver 11/32” nut driver or ratchet Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based on skill set. NOTE: Keep all hardware organized as you work. ATTENTION: ...
  • Instructions for Heat Exchanger to AC conversion in an Entrance Sign
    Entrance Sign Conversion Heat Exchanger to Air Conditioner   Tools Required Prior to performing this procedure, you will need to have the following tools: Phillips Screw driver Small flat screw driver A second person to help with lifting the rear doors 5/16” nut driver or ratchet Time to Compl...
  • Instructions for IDTech to TXP conversion in AS4
    Conversion from IDTech to TXP in Auto Sentry Petro and a New Decal Powering Down the Auto Sentry Petro WARNING: Failure to power off the Auto Sentry Petro increases the risk of serious bodily injury or death, and also causes the credit card reader to go into a tamper state which will then have to...
  • Instructions for IDTech upgrade in AS3 SuperFlex
    Auto Sentry Conversion adding IDTech Card Readers to an Auto Sentry Super flex Tools Required Prior to performing this procedure you will need to have the following tools: 3/8” nut driver or ratchet 11/32” nut driver or ratchet 5/16” nut driver or ratchet Small, sharp knife Time to Completion T...
  • Instructions for installation of the APALLDISBOX antenna distribution box
    APALLDISBOX – USING THE RFID READER IN A LANE WITH NO AUTO SENTRY   Tools Required Prior to performing this procedure you will need to have the following tools: Flat head screw driver Time to Completion We estimate that it will take 15 minutes to perform this procedure, time will vary based on ...
  • Instructions for installation of the APALLDISBOX antenna distribution box
    MDS SENSOR POT LEVEL ADJUSTMENT ON A FUJITSU F400 BILL DISPENSER Tools Required Prior to performing this procedure, you will need to have the following tools: #2 Phillips screw driver Flat head screw driver Time to Completion We estimate that it will take 10 minutes to perform this procedure, t...
  • Instructions for Installing a coin acceptor in an ExP
    Auto Sentry eXP Install the Coin Acceptor Tools Required Prior to performing this procedure, have the following tools available: Phillips Screw driver 3/8” nut driver or ratchet 11/32” nut driver or ratchet Sharp hobby knife Time to Completion We estimate that it will take 1 hour to perform thi...
  • Instructions for Installing a coin hopper in an ExP
    Auto Sentry ExP Install the Coin Hopper Tools Required Prior to performing this procedure you will need to have the following tools: #2 Phillips Screw driver 3/8”, 11/32”, 5/16”, and ¼” nut drivers or ratchet Time to Completion ICS estimates that it will take 2 hours to perform this procedure, ...
  • Instructions for installing a loop detector in AS4 Petro
    Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver 5/16” nut driver or ratchet Small flat screw driver Wire cutter Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based on skill...
  • Instructions for installing an APALLINONE in a new AS Flex - also see procedure IG Auto Passport Flex All-in-one 3.0
    Installing the RFID Auto Passport, RFID All-In-One Reader Antenna to an Auto Sentry flex       Completion Time We estimate that it will take 30 minutes to perform this procedure. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power su...
  • Instructions for installing an APALLINONE in a new AS Petro
    Installing the ALL-IN-ONE RFID Reader Antenna in an Auto Sentry Petro 2nd Generation     Powering Off the Auto Sentry On the site server desktop, click on the VNC icon for the Auto Sentry. On the menu bar, click on the Windows flag icon. Click the Shutdown button. Wait until the Auto Sentry dis...
  • Instructions for installing IDTech in old style Petro
    AUTO SENTRY PETRO CONVERSION TXP CARD READER TOIDTECH CARD READER (CPFDCARDREAD1)   Tools Required Prior to performing this procedure, you will need to have the following tools: 3/8”, 11/32”, and 9/32” nut driver or ratchet Wire cutter for cutting wire ties #2 Phillips screw driver Sharp fine ti...
  • Instructions for installing the BT dongle in AS2, AS3 and AS7
    Installing Hardware for WashNOW! Tools Required Prior to performing this procedure, you will need to have the following tools: Wire cutter  Time to Completion We estimate that it will take 15 minutes to perform this procedure, time will vary based on skill set.NOTE: Keep all hardware organized ...
  • Instructions for installing the center security plate in the AS7
    ASFLEXHD Install Center Security Wall Tools Required Prior to performing this procedure you will need to have the following tools: 3/8” wrench, nut driver or ratchet Phillips screw driver Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based...
  • Instructions for installing the door lock drip kit in an ExP
    Adding the door lock drip cup to an Wash Valet eXP Tools Required Prior to performing this procedure you will need to have the following tools: Long flat Screw driver Hammer Time to Completion We estimate that it will take 10 minutes to perform this procedure, time will vary based on skill set....
  • Instructions for installing the First Data IDTech Card Readers with Front-facing barcode scanner Cash Plate for the ExP
    Instructions for installing the First Data IDTech Card Readers with Front-facing barcode scanner Cash Plate for the ExP Tools Required Prior to performing this procedure you will need to have the following tools: #2 Phillips Screw driver Small flat head screwdriver 3/8” nut driver or ratchet 11/...
  • Instructions for installing the First Data IDTech Cash Plate for the ExP
    Auto Sentry eXP First Data ID Tech Cash Plate     Completion Time We estimate that it will take 2 hours to perform this procedure. Keep all hardware organized as you work.WARNING: Please have a certified electrician check voltages on the power supply before installingnew components. The voltage...
  • Instructions for installing the SCN000002-00 barcode reader to an AS Flex head ENC2 - bottom
    Front Facing Barcode Scanner Installation in anAuto Sentry flex   Completion Time Estimated time to complete this procedure is 2 hours. Keep all hardware organized as you work. WARNING: Please have a certified electrician check voltages on the power supply before installing new components. The ...
  • Instructions for installing Truck Bed Sensor 2
    Truck Bed Ultrasonic Sensor     Parts Included   Completion Time We estimate that it will take one hour to perform this procedure. Keep all hardware organized as you work.WARNING: This process needs to be completed while the electricity is off to the truck bed breaker. Please have a certified ...
  • Instructions for mounting a new relay board in a WBC
    Tools Required Prior to performing this procedure you will need to have the following tools: 1/4” nut driver 1/16” hex wrench or bit Time to Completion We estimate that it will take 30 minutes to perform this procedure, time will vary based on skill set. NOTE: Keep all hardware organized as you...
  • Instructions for mounting the ENTHEATAC to a Sign Door and Mounting the Door
    Entrance / Menu Sign New Air Conditioner and Door Tools Required Prior to performing this procedure you will need to have the following tools: Phillips Screw driver Small Flat Screw driver 7/16" nut driver or ratchet Two people to install Time to Completion We estimate that it will take 1 hour ...
  • Instructions for replacing the 15" display in the AS3
    Replacing the 15” Touch Screen Display in an Auto Sentry flex         Time to Complete We estimate that it will take 1 hour to perform this procedure, and time will vary based on skill set.   WARNING: Please have a certified electrician check voltages on the power supply before installing new...
  • Instructions for replacing the 17" display assembly
    Auto Sentry flex HD Display Replacement   Completion Time We estimate that it will take 2 hours to perform this procedure, time will vary based on skill set.All hardware removed will be used again during re-install so keep organized. NOTE: Please read the entire procedure before starting.   WARN...
  • Instructions for replacing the APALLINONE enclosure
    Tools Required Prior to performing this procedure you will need to have the following tools: #1 Flat head screw driver Time to Completion We estimate that it will take 1 hour to perform this procedure, time will vary based on skill set.NOTE: Keep all hardware organized as you work. CAUTION: THI...